Monday, February 21, 2011

We're studs

We’ve reached a major milestone at Loveless Lake: We’re down to studs on all walls.
Even in the kitchen, where Chris joyfully pulled out the cabinets, along with this beaut.



We occasionally fantasize about designing a pulley system or buying a snowmobile and sled to give us some extra power to haul all the stuff up from the cabin to the road. I did buy a little "come-along" recently because we thought we might need it to help us remove the refrigerator. We ended up sliding it up the snowbank and dropping it close to the road. (Hey, when you've got two rotting boats on your property, what's a fridge?)

Chris with a load of drywall. Refrigerator is on the left.



I'm bonded with the truck.



We're thinking a teardown party in the spring might be a fun way to help haul away the remainder of the Loveless carcass, and usher us into the next phase.


I'll provide food, beverages, a warm fire and a campsite for anyone who wants to burn a gazillion calories and work those glutes.

Any takers?

No comments:

Post a Comment